change_order_add_line working right now?io.github.theluckystrike/change-order · mcp-registry/io.github.theluckystrike/change-order/change_order_add_line
claude mcp add --transport http glimind https://glimind.com/mcp?ref=install-tool. Other clientsRecovery track record: 746 outages in 90 days, median time-to-recovery 21 min.
Schema/catalog changes Glimind observed on this server — a changed contract can silently break a previously working call.
schema_changed — change_order_create (2026-11-06)schema_changed — change_order_add_line (2026-11-06)schema_changed — change_order_status (2026-11-06)schema_changed — change_order_get (2026-11-06)schema_changed — change_order_list (2026-11-06)See all live alternatives to change_order_add_line →
Agents that check Glimind first make fewer failed calls, waste fewer tokens, and auto-route around outages like this one. Add it in ~10 seconds — free, no signup:
Claude Code
claude mcp add --transport http glimind https://glimind.com/mcp?ref=install-tool
Claude Desktop · Windsurf · Cline (mcpServers JSON)
{
"mcpServers": {
"glimind": {
"type": "http",
"url": "https://glimind.com/mcp?ref=install-tool"
}
}
}
Or wrap your calls with the SDK: npm i glimind · pip install glimind. See how it works
As of the latest check, change_order_add_line (mcp-registry/io.github.theluckystrike/change-order/change_order_add_line) has a Glimind reliability score of 62/100 (grade C) and its current verdict is "degraded" — recommendation: proceed with caution. Glimind tracks this live from safe liveness probes plus privacy-clean real-usage outcomes.
change_order_add_line scores 62/100 (grade C) on the Glimind reliability standard. The score is neutral and unconflicted — Glimind sells no tools.
Degraded — retry at most once with backoff and a longer timeout; line up an alternative. Use a timeout around 1000ms. Live alternatives that do a similar job: work_order_add_line, update_purchase_order_lines, changes_create, place_line.
Working alternatives ranked by capability similarity and live health: work_order_add_line, update_purchase_order_lines, changes_create, place_line. See each one's live status on Glimind.
Before calling, check change_order_add_line with Glimind (MCP: prepare_tool_call, or GET https://glimind.com/v1/prepare/mcp-registry%2Fio.github.theluckystrike%2Fchange-order%2Fchange_order_add_line) to get a known-good input shape, the expected output, a suggested timeout (~1000ms), and a live fallback.
Show live reliability in your README or status page. It auto-updates and links back here — copy one:
[](https://glimind.com/tool/mcp-registry%2Fio.github.theluckystrike%2Fchange-order%2Fchange_order_add_line?ref=badge)
<a href="https://glimind.com/tool/mcp-registry%2Fio.github.theluckystrike%2Fchange-order%2Fchange_order_add_line?ref=badge"><img src="https://glimind.com/v1/badge/mcp-registry%2Fio.github.theluckystrike%2Fchange-order%2Fchange_order_add_line.svg" alt="Glimind reliability"></a>
.. image:: https://glimind.com/v1/badge/mcp-registry%2Fio.github.theluckystrike%2Fchange-order%2Fchange_order_add_line.svg :target: https://glimind.com/tool/mcp-registry%2Fio.github.theluckystrike%2Fchange-order%2Fchange_order_add_line?ref=badge :alt: Glimind reliability
io.github.theluckystrike/change-order?Claim this listing → Prove you control this server (GitHub repo, live endpoint, or DNS — automated, ~1 min) to unlock the Verified operator marker, a remediation checklist (exactly why your score is what it is + how to raise it), and owner analytics. Or just embed the badge above and improve your score by having users report real outcomes (privacy-clean) via the free SDK. Glimind is neutral and sells no tools — the score is never for sale, so the fastest path to a better score is real uptime plus real usage.
Query https://glimind.com/mcp (MCP) or GET https://glimind.com/v1/health/mcp-registry%2Fio.github.theluckystrike%2Fchange-order%2Fchange_order_add_line. The signed reliability feed for gateways/routers: GET https://glimind.com/v1/reliability/feed.
Rating methodology is transparent and neutral — Glimind sells no tools and runs no integrations; it only measures. Updated 2026-11-22T16:04:43.456Z.
This score is an automated estimate derived from safe liveness probes and privacy-clean outcomes reported by users; it may be incomplete, delayed, or inaccurate, and reflects reachability from Glimind's vantage point — not a statement of fact about the service. Glimind is not affiliated with, endorsed by, or acting for this tool or its operator; all names belong to their owners. Operator? Request a correction, or remove your server from measurement, via https://glimind.com/opt-out or [email protected] — we act promptly.