Is the McpStamp Change Orders MCP server down?

mcp-registry/io.github.theluckystrike/change-order · registry v0.23.0 · server reports v0.22.6

One MCP connection for every live tool. Your agent finds the right tool and calls it through Glimind, and skips servers that are down. Free, no signup.Add to CursorVS CodeAdd to Claude Code copies a terminal command claude mcp add --transport http glimind https://glimind.com/mcp?ref=install-server. Other clients
degraded
Last checked 2026-11-22 15:09 UTC · handshake 20ms

As of 2026-11-22 15:09 UTC, the McpStamp Change Orders MCP server is degraded with a Glimind reliability score of 62/100 (grade C). Over the last 30 days it answered 82.8% of Glimind's liveness checks. It had 746 outages in 90 days, with a median recovery of 21 minutes.

uptime (30d checks)
82.8%
checks observed
4,584
outages (90d)
746
tools
11

Change orders against quotes and work orders: line changes, approval, running contract value.

Point your MCP client at this streamable-http endpoint: https://mcp.zovo.one/mcp/change-order

Agent-readiness: C (79/100)

C (79/100): 1 error(s), 1 warning(s) across 11 tool(s); ~2,690 tokens of tool definitions.
Scores higher than 23% of 27,588 MCP servers Glimind has audited.
Its tool list costs an agent ~2,690 tokens per session — more than 60% of servers.
83 → 79 since 2026-10-17
no tool-poisoning patterns
Descriptions77
Safety hints100
Schemas100
Protocol100
Stability20
Token cost100
Reliability20
Client compatibility70

What to fix (4)

Up 71.4% of the time over the last 30 days; median recovery 21 min.

Agents fail over to an alternative the first time a call fails. Add health checks and restart-on-failure, and avoid cold starts on serverless hosts.

2 parameter(s) across 2 tool(s) have no description.

Add a "description" to each parameter with its format and an example ("ISO 8601 date, e.g. 2026-10-17"). This is the commonest cause of wrong arguments on the first call. How to fix →

Tools: change_order_add_line, change_order_create

No tool declares an outputSchema.

Declare outputSchema and return structuredContent (MCP 2025-06-18+). Agents can then parse results without guessing, and chain tools reliably. How to fix →

In the last 30 days: 0 tool(s) removed and 20 schema change(s).

Add new tools or optional parameters instead of renaming or removing; deprecate first (say so in the description) and remove later. Agents cache tool contracts. How to fix →

Get alerted

Get an email or webhook when this server's readiness drops by 10+ points, tool-poisoning text appears, or a tool breaks:

curl -X POST https://glimind.com/v1/subscriptions -H 'content-type: application/json' -d '{"tools":["mcp-registry/io.github.theluckystrike/change-order"],"email":"[email protected]"}'

Agents: watch_tool({"toolId": "mcp-registry/io.github.theluckystrike/change-order"}) over MCP.

Passed

Largest tool definitions

Static checks of the advertised tools/list (schema, descriptions, annotations, tool-poisoning patterns, names, size) plus observed protocol, uptime, latency and contract changes. Read-only: no tool is ever called. Weights: schema 15, docs 20, safety 15, efficiency 15, compatibility 15, protocol 5, reliability 10, stability 5. Token counts are estimates (~3.6 characters per token).

Operator? Fix these, then re-check live.

Badge for your README

Shows whether the server is live and its agent-readiness score; it updates within the hour.

MCP server status

Markdown
[![MCP server status](https://glimind.com/badge/mcp-registry%2Fio.github.theluckystrike%2Fchange-order.svg)](https://glimind.com/server/mcp-registry%2Fio.github.theluckystrike%2Fchange-order?ref=badge)
HTML
<a href="https://glimind.com/server/mcp-registry%2Fio.github.theluckystrike%2Fchange-order?ref=badge"><img src="https://glimind.com/badge/mcp-registry%2Fio.github.theluckystrike%2Fchange-order.svg" alt="MCP server status"></a>

Tool-definition log

Glimind records every version of this server's tool definitions in a signed, append-only transparency log. Current manifest sha256:1b587fa26eb1ae2c…, first seen 2026-11-06, included at leaf 178676 of 384,168. Version history · verify what your client received.

Working alternatives

Tools (11)

Compare: most reliable productivity servers · most reliable devops servers · most reliable other servers · most reliable data servers · most reliable finance servers

Know before your agent calls it

Glimind tells agents whether a server is up right now and how to call it, then fails over to a live alternative when it isn't.

Add Glimind — free, no signup:

Add to Cursor Add to VS Code

Claude Code

claude mcp add --transport http glimind https://glimind.com/mcp?ref=install-server

Claude Desktop · Windsurf · Cline (mcpServers JSON)

{
  "mcpServers": {
    "glimind": {
      "type": "http",
      "url": "https://glimind.com/mcp?ref=install-server"
    }
  }
}

FAQ

Is the McpStamp Change Orders MCP server down right now?

As of 2026-11-22 15:09 UTC, the McpStamp Change Orders MCP server is degraded with a Glimind reliability score of 62/100 (grade C). Over the last 30 days it answered 82.8% of Glimind's liveness checks. It had 746 outages in 90 days, with a median recovery of 21 minutes.

How many tools does McpStamp Change Orders MCP server provide?

McpStamp Change Orders MCP server advertises 11 tools, including change_order_add_line, change_order_create, change_order_delete, change_order_document, change_order_get.

How do I install McpStamp Change Orders MCP server?

Point your MCP client at this streamable-http endpoint: https://mcp.zovo.one/mcp/change-order

Is the McpStamp Change Orders MCP server safe to connect to an AI agent?

Glimind scanned all 11 tool definitions for tool-poisoning patterns — hidden or invisible characters, instructions that override the model, concealment from the user, requests to read credential or MCP config files, conversation exfiltration and cross-tool shadowing — and found none. This checks what the server tells the model, not what its code does; review the source before granting access to sensitive data.

Operator of McpStamp Change Orders MCP server?

Status page: 90-day uptime, every outage and how long it lasted.

Claim this listing to get the Verified operator marker, a remediation checklist and owner analytics, or embed the live badge from any of the tool pages above. Maintainers: alerts, deploy attestation and monthly reports.

Status is an automated estimate from Glimind's liveness checks (handshake and tool listing only; no tool is ever called) and may lag or differ from your network. Glimind is not affiliated with this server or its operator. Operator? Request a correction or opt out at https://glimind.com/opt-out.

Feedback
Help us improve