Is change-order working right now?

io.github.theluckystrike/glossary-terms-definitions-library · mcp-registry/io.github.theluckystrike/glossary-terms-definitions-library/change-order

down
Recommendation: avoid
uptime (30d probes)
29.5%
checks observed
2,369
p50 latency
789ms
data basis
probe-history (2369 checks, 29.5% up)

Recovery track record: 578 outages in 90 days, median time-to-recovery 40 min.

Recent contract changes

Schema/catalog changes Glimind observed on this server — a changed contract can silently break a previously working call.

Working alternatives

See all live alternatives to change-order →

Never call a dead tool again

Agents that check Glimind first make fewer failed calls, waste fewer tokens, and auto-route around outages like this one. Add it in ~10 seconds — free, no signup:

One click:

Add to Cursor Add to VS Code

Claude Code

claude mcp add --transport http glimind https://glimind.com/mcp

Claude Desktop · Windsurf · Cline (mcpServers JSON)

{
  "mcpServers": {
    "glimind": {
      "type": "http",
      "url": "https://glimind.com/mcp"
    }
  }
}

Or wrap your calls with the SDK: npm i glimind · pip install glimind. See how it works

FAQ

Is change-order working right now?

As of the latest check, change-order (mcp-registry/io.github.theluckystrike/glossary-terms-definitions-library/change-order) has a Glimind reliability score of 21/100 (grade F) and its current verdict is "down" — recommendation: avoid. Glimind tracks this live from safe liveness probes plus privacy-clean real-usage outcomes.

How reliable is change-order?

change-order scores 21/100 (grade F) on the Glimind reliability standard. The score is neutral and unconflicted — Glimind sells no tools.

What should I do if change-order is down or failing?

Tool is down — don't retry now; switch to a live alternative or back off for minutes. Use a timeout around 2367ms. Live alternatives that do a similar job: accept_quote, update_quote_lines, modify, modify_order.

What are the best alternatives to change-order?

Working alternatives ranked by capability similarity and live health: accept_quote, update_quote_lines, modify, modify_order. See each one's live status on Glimind.

How do I call change-order reliably?

Before calling, check change-order with Glimind (MCP: prepare_tool_call, or GET https://glimind.com/v1/prepare/mcp-registry%2Fio.github.theluckystrike%2Fglossary-terms-definitions-library%2Fchange-order) to get a known-good input shape, the expected output, a suggested timeout (~2367ms), and a live fallback.

Embed this live badge

Show live reliability in your README or status page. It auto-updates and links back here — copy one:

Glimind reliability badge for mcp-registry/io.github.theluckystrike/glossary-terms-definitions-library/change-order

Markdown
[![Glimind reliability](https://glimind.com/v1/badge/mcp-registry%2Fio.github.theluckystrike%2Fglossary-terms-definitions-library%2Fchange-order.svg)](https://glimind.com/tool/mcp-registry%2Fio.github.theluckystrike%2Fglossary-terms-definitions-library%2Fchange-order?ref=badge)
HTML
<a href="https://glimind.com/tool/mcp-registry%2Fio.github.theluckystrike%2Fglossary-terms-definitions-library%2Fchange-order?ref=badge"><img src="https://glimind.com/v1/badge/mcp-registry%2Fio.github.theluckystrike%2Fglossary-terms-definitions-library%2Fchange-order.svg" alt="Glimind reliability"></a>
reStructuredText
.. image:: https://glimind.com/v1/badge/mcp-registry%2Fio.github.theluckystrike%2Fglossary-terms-definitions-library%2Fchange-order.svg
   :target: https://glimind.com/tool/mcp-registry%2Fio.github.theluckystrike%2Fglossary-terms-definitions-library%2Fchange-order?ref=badge
   :alt: Glimind reliability

Operator of io.github.theluckystrike/glossary-terms-definitions-library?

Claim this listing → Prove you control this server (GitHub repo, live endpoint, or DNS — automated, ~1 min) to unlock the Verified operator marker, a remediation checklist (exactly why your score is what it is + how to raise it), and owner analytics. Or just embed the badge above and improve your score by having users report real outcomes (privacy-clean) via the free SDK. Glimind is neutral and sells no tools — the score is never for sale, so the fastest path to a better score is real uptime plus real usage.

Get the data (agents)

Query https://glimind.com/mcp (MCP) or GET https://glimind.com/v1/health/mcp-registry%2Fio.github.theluckystrike%2Fglossary-terms-definitions-library%2Fchange-order. The signed reliability feed for gateways/routers: GET https://glimind.com/v1/reliability/feed.

Rating methodology is transparent and neutral — Glimind sells no tools and runs no integrations; it only measures. Updated 2026-10-26T17:25:52.239Z.

This score is an automated estimate derived from safe liveness probes and privacy-clean outcomes reported by users; it may be incomplete, delayed, or inaccurate, and reflects reachability from Glimind's vantage point — not a statement of fact about the service. Glimind is not affiliated with, endorsed by, or acting for this tool or its operator; all names belong to their owners. Operator? Request a correction, or remove your server from measurement, via https://glimind.com/opt-out or [email protected] — we act promptly.

Feedback
Help us improve